Nexus Insight
Control Tower
One screen linking PoC evidence, operational KPIs, approval gates and budget. Every metric has an accountable owner and a next action.
Platform assessment score
63.4
100-point framework · critical gaps left: 1
Critical scenarios passed
81/97
6/10 PoCs complete · 83.5% pass rate
Pilot budget spent
730 M ₫
Hard cap 1.50 B ₫ · 770 M ₫ remaining
Customisation index
22
Lower is closer to fit-to-standard; the alert threshold is 45
Gate Review G0 → G4
Evidence → Gap → Cost → Risk → Decision. Budget opens only when a gate is approved.
Baseline
Day 0–30
4/4 criteria · Approved
Blueprint
Day 31–60
5/5 criteria · Approved
Platform Selection
Day 61–90
4/5 criteria · In review
Wave Rollout
Month 4–9
0/3 criteria · Not open
Value Realization
Month 10–12
0/3 criteria · Not open
Key KPIs
Each KPI has an owner and a next action. Metrics off target are flagged for the current sprint.
Time-to-PoC
On targetProduct Lead · Hold the pace with a reusable library of PoC scripts
24days
target 30
Critical test pass rate
On targetQA/UAT Lead · Close the 4 remaining scenarios in P6 and P7
96.40%
target 95
Integration message success
On targetIntegration Engineer · Keep the DLQ under 20 messages a day with backoff retries
99.93%
target 99.9
Barcode scan accuracy
On targetBA Inventory · Replace 6 ageing scanners in the raw-material warehouse
99.62%
target 99.5
Month-end close
Off targetBA Finance · Automate the 4 reconciliation steps still done by hand
5.50days
target 5
Average OEE
Off targetEnterprise Architect · Cut changeover downtime on production line 2
71.40%
target 75
Blocking G2
Waiting on the last 4 critical scenarios in P6, P7 and P10
100% of critical scenarios pass
93 of 97 scenarios pass, 4 still running
Sprint 2 — Assessment Engine
The 100-point framework runs and the fit-gap matrix can be exported
33
avg velocity
28 Sep 2026
ends
G1
gate at sprint end
Status of the 10 mandatory PoCs
A PoC only counts as passed when every critical scenario passes on real data.
- P1
E2E Purchase-to-Pay
PR → PO → Goods receipt → Invoice → Payment
12/12Passed - P2
MRP / APS
Demand → Materials → Production schedule
9/9Passed - P3
MES / OEE
Production order → Machine data → OEE
6/10Running - P4
BOM / Routing / Costing
BOM → WIP → Actual cost → Variance
11/11Passed - P5
Barcode & Traceability
Receipt/Issue → Barcode → Lot traceability
8/8Passed - P6
QMS
IQC/IPQC/OQC → NCR/CAPA → Release
5/9Running - P7
EAM / CMMS
Asset → PM → Work order → Spare parts → MTBF/MTTR
4/8Running - P8
Intercompany & Finance
Internal buy/sell → Payables → Costing → Reconciliation
10/10Passed - P9
BI / Control Tower
KPI → Alert → Drill-down → Owner → Action
9/9Passed - P10
OT / API Integration
External device or system → Integration → Message success
7/11Running
Risks to watch
Ranked by probability × impact; each risk has a control and an owner.
The company is perceived as a consultancy rather than a software product
20Clear IP ownership, subscription revenue, a code repository and a public product roadmap
Owner: Founder
Excessive customisation inflates TCO and upgrade risk
20Fit-to-standard principle, change control and a customisation index
Owner: Enterprise Architect
Poor customer data quality makes the PoC inconclusive
20A mandatory data readiness gate before G1 with a minimum score of 80
Owner: Data/AI Engineer
Dynamics 365 licence cost exceeds what an SME can afford
16Start with Business Central, use startup benefits, expand in stages
Owner: Product Lead
Budget discipline
No spend beyond a gate. Every customisation is converted into TCO and risk before approval.
G0
250 M ₫
budget released
G1
480 M ₫
budget released
G2
Waiting
rollout budget not open
Pilot cap
1.50 B ₫
locked at G0