Programme

12-month roadmap

Six phases from product foundation to commercial scale; each phase ends with a gate or a sellable increment. Budget opens step by step.

2/6 phases completeOverall progress 54%

Programme progress

54%

Evenly weighted average across phases

Sprints run

7/8

Two-week cycles with a demo at the end of each

Design partner goal

3

In three different industries to avoid concentration

Paid pilot goal

5

With a contract and committed KPIs

P0

Product Foundation

Day 0–30Gate G0

Stand up the product foundation and governance before writing a line of business logic

Progress100%
  • Product charter
  • ICP and personas
  • Product architecture
  • Azure landing zone
  • D365 sandbox / demo tenant
  • Requirement catalog
  • PoC test harness
  • GitHub and CI/CD
  • Security baseline
P1

Blueprint

Day 31–60Gate G1

Turn requirements into a design that can be verified

Progress100%
  • 35 requirements
  • Fit-gap matrix
  • Data model
  • Process maps
  • Integration map
  • KPI dictionary
  • 10 PoC scripts
  • Demo dataset
P2

Pilot

Day 61–90Gate G2

Run 10 PoCs on real data and refresh the business case

Progress78%
  • 10 PoCs run for real
  • UAT sign-off
  • Updated TCO
  • Updated risk register
  • Updated business case
P3

MVP Product

Month 4–6

Package the capability into something sellable

Progress34%
  • Assessment Engine
  • PoC Lab
  • Connector Framework
  • KPI Control Tower
  • Industry templates
  • AI assistant v1
P4

Commercial Pilot

Month 7–9Gate G3

Prove commercial value with design partners

Progress12%
  • 3–5 design partners
  • 2 vertical templates
  • 1–2 reusable connectors
  • Case study
  • ROI evidence
P5

Scale

Month 10–12Gate G4

Shift to a SaaS model and a partner ecosystem

Progress0%
  • SaaS / managed accelerator model
  • Marketplace readiness
  • Partner ecosystem
  • Internationalisation
  • Channel playbook

Revenue streams

OLYM3 does not resell Dynamics 365 licences. Value comes from IP, accelerators, integration, data and operations services.

  • A

    Assessment

    From month 1

    Fixed-price digital transformation assessment and requirement/PoC assessment

  • B

    Accelerator Subscription

    From month 4

    Nexus Core, Insight, Flow and AI subscriptions priced per company, user or module

  • C

    Implementation Accelerator

    From month 3

    IP, accelerators, integration, configuration, data migration, testing and managed services

  • D

    Industry Pack

    From month 7

    Manufacturing, Distribution, Agriculture/Food and Logistics packs

  • E

    Managed Digital Operations

    From month 9

    Monitoring, control tower, automation, AI agents and continuous improvement

Go-to-market

Expansion in three stages, starting with the industries that have the clearest traceability and costing needs.

Stage 1 — Vietnam

ManufacturingDistributionAgriculture / FoodLogistics

Stage 2 — ASEAN

SingaporeThailandIndonesiaMalaysia

Stage 3 — Microsoft ecosystem

Partner / channel ecosystemMarketplaceCo-sell once qualifiedIndustry ISVs